How to Market CSP Technology

solar concentrator manufacturing

Session: 6 of 6

Webinar Time: 2 Hours (6 Sessions) + 30 minutes Q&A

Flexible - Choose your data and time

Session Overview

Most  Concentrated Solar Power projects are large, over 1MW, and need to be pitched for funding/grants to investors, developers, and governments. We’ll discuss some innovative ways to reach out to potential leads.

 

 

Content

  • Creating a 1-minute elevator pitch
  • Creating Investor Deck
  • Maintain social media presence
  • Growing leads through LinkedIn
  • Get recognized at trade shows
  • The power of retargeting through Ads
  • Using YouTube ads
  • Growing your email list & drip campaign
    • Creative ways to grow an audience

    Download The Solar Concentrator Installation Guide

    Get Our Solar Concentrator Installation Manual
    Get Our Solar Concentrator Installation Guide
    Solar Concentrator Installation GuideDownload Now